Celair Profile Series Installationshandbuch Seite 19

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 24
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 18
Installation Instructions
4.0 Connections
Profile
Drill a 50mm (2”) hole in the dropper to bring the service lead and
controller cable into the ceiling space. The rubber grommet fitted to the
service lead is used to seal the hole in the dropper from the inside.
Connect the controller and solenoid cables into the control box. Refer to
Controller installation and commissioning instructions
Plug the pre-wired service lead into the GPO.
Electrical leads must not be draped over the fan deck or loosely
around the unit and must be fastened securely.
4.4.3. Wiring Diagram
Page 19
Seitenansicht 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24

Kommentare zu diesen Handbüchern

Keine Kommentare